top of page

Project 1 – Application of Building Services 
 

Tasks - Methodology This project is related to the students’ studio design project in semester 2 which relates to a domestic size building (i.e. a retreat house, etc.) Students are expected to demonstrate their understanding of building services by proposing and designing the most appropriate systems for the building which include:

 

i) electrical supply system

ii) cold water and hot water supply system

iii) sewerage and sanitary system

iv) drainage system

 

Therefore students are required to produce appropriate drawings and diagrams which include specifications, symbols, legends, images, texts, etc. to describe the planning and installation of all the building services. Additionally, students may also include specific clauses from the Uniform Building By-Law (UBBL) or other relevant Acts, Laws or guidelines which relate to the proposed systems into their presentation boards.

Project 2 â€“ Case Study and Documentation of Building Services Systems

 

Under the tutelage of a lecturer, each group is required to choose a building of 5-storey high which can be either public or commercial buildings (i.e. office blocks, institutional buildings, shopping malls, etc.). Each group is to perform a thorough study and analysis of the following services systems associated to the building:

 

i. mechanical ventilation

ii. air-conditioning system

iii. fire protection system (active and passive fire protection system)

iv. mechanical transportation system

 

Each group will need to document their findings accordingly. It is entirely up to the group members on how they want to delegate the tasks to each of their members. The purpose of this assignment is to give a clearer picture of what the students will and have learnt in the classroom and to evaluate their understanding on the systems that they have observed.

 

The requirements of the project are as follows:

 

1. Identify all the required building services components installed in the building

2. Perform a thorough study on all the services systems

 

i. mechanical ventilation

ii. air-conditioning system

iii. fire protection system (active and passive fire protection system)

iv. mechanical transportation system

 

3. Obtain estimated dimensions and sizes of the spaces required for all the equipment and plant rooms identified

4. Provide brief explanation on how the building services components function. This explanation shall be in qualitative form and therefore no calculation is required.

5. Summarize the systems in diagrammatic form.

 

© 2023 by Dawkins & Dodger Architecture. Proudly created with Wix.com

  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page